What Are the MOQs and Lead Times for Supplement Contract Manufacturing?
- Share
- Issue Time
- Oct 28,2026

For dietary supplement contract manufacturing at FORNUTRA, MOQs start at 500 bottles per SKU for gummies, capsules, tablets, and drops, and 200 kg per SKU for powders. Samples take about 1 week, and mass production takes 10-15 days once the formula, packaging, and materials are confirmed.
- Gummies, capsules, tablets, drops500 bottles per SKU
- Powders200 kg per SKU
- Softgels200,000 softgels per SKU
- Oral liquids30,000 vials per SKU (30 ml or 60 ml)
- Sample lead timeAbout 1 week
- Mass production10-15 days after formula, packaging and materials are confirmed
- ManufacturingBased in Guangzhou, China, with two production bases and three R&D centers
Final MOQ can vary with the formula, packaging, and level of customization, and is confirmed in your quotation. See our supplement contract manufacturing services or send an inquiry for a quote.